Incident management process
Detection, response and recovery for security incidents.
The incident management process is applied when:
- an (information security) incident has occurred, such as theft or loss of information or resources;
- a nonconformity has been identified, for example during monitoring and measurement, an internal audit, a penetration test or a certification audit.
- 01
Report
The incident is reported to the incident manager and recorded in the incident register.
- 02
Classify
The incident is classified by severity. For information security incidents, the security officer is involved.
- 03
Analyse and recover
Cause and impact are investigated, measures are taken and those affected are informed.
- 04
Close and learn
The incident is documented and closed; improvement actions are recorded and followed up.
Risk assessment
Identifying and assessing information security risks.
The risk assessment procedure consists of four steps to identify, evaluate and control information security risks.
- 01
Set criteria
Criteria for likelihood and impact (high, medium, low) and acceptance criteria are set and adjusted where necessary.
- 02
Identify risks
Threats to the confidentiality, integrity and availability of assets and processes are mapped.
- 03
Analyse risks
Likelihood and impact are estimated for each risk; the combination determines the risk level.
- 04
Evaluate risks
The risk level is tested against the acceptance criteria and the treatment is decided.
Risk treatment
Treating and mitigating identified risks.
Risk assessments take place at least annually, and after any significant change or incident. The risk manager organises the assessment with the owners of the relevant business processes within the ISMS scope.
Initial assessment
The values for likelihood and impact are evaluated and adjusted where needed. Generic risks are then translated to the organisation's processes and assets, with an estimate of likelihood and impact. New risks are added. Each risk has an owner, usually the responsible manager or process owner.
Annual reassessment
Likelihood and impact of all risks are reassessed and the effectiveness of measures is determined. Where measures are not effective, the risk owner decides how to handle the residual risk: accept, reduce, avoid or transfer (insure). New risks can be added based on recent incidents or events.
Example: one risk over time
| Moment | Likelihood | Impact | Risk | Treatment |
|---|---|---|---|---|
| Initial | H | M | H | Reduce: two Annex A controls are implemented; expected residual risk L |
| First evaluation | M | L | L | Accept: the measures are effective |
| Second evaluation | H | L | M | Reduce: existing measures are extended and an additional measure is taken |
Acceptance criteria
- All identified risks are mitigated to level L.
- Risks at level M are mitigated within 12 months.
Change management process
Managing and approving changes to systems and infrastructure.
The change management process applies to operational changes (such as process changes), changes to internal and external IT components and any other change likely to affect the confidentiality, integrity or availability of information within the ISMS scope.
- 01
Submit
The change is submitted to the change manager and recorded in the change log.
- 02
Impact analysis
The impact on all stakeholders is analysed. If the data processing involves a high risk, a DPIA is carried out.
- 03
Treat risks
Information security risks are identified and treated. Risks classified M or H require management approval.
- 04
Plan and execute
The change is scheduled and carried out.
Software development process
Secure development, including code reviews and security testing.
- 01
Specification
User stories are created and prioritised in the ticketing system. Stories affecting the availability, integrity or confidentiality of data are discussed with senior developers to choose a secure approach.
- 02
Development
Developers build and test locally on their workstation first.
- 03
Pull/merge request
A completed story is submitted via a pull/merge request for merging into the main branch.
- 04
Code review
The code is reviewed by another team member.
- 05
Deploy to staging
A pipeline deploys the software automatically to the staging environment.
- 06
Test on staging
Libraries are checked for vulnerabilities and a static code review is performed.
- 07
Deploy to production
A pipeline deploys the software automatically to production.
- 08
Test on production
Manual tests confirm the production system works correctly.
Authorisation management process
Managing user rights and access authorisations.
Available after login
This section contains internal and technical details. Customers and prospects can read it after logging in.
Customer onboarding process
Security arrangements when onboarding new customers.
- 01
Establish compliance requirements
Together with the customer, we establish whether specific compliance requirements apply, such as two-factor authentication, labelling of sensitive information or customer-specific policies.
- 02
Record arrangements
Special arrangements, such as deviations from the standard SLA, are recorded in the overview of legal and contractual requirements.