Trust Center · Chapter 04

Security and operational processes

The processes LemonB uses to manage incidents, risks, changes, software development, authorisations and customer onboarding.

Incident management process

Detection, response and recovery for security incidents.

The incident management process is applied when:

  • an (information security) incident has occurred, such as theft or loss of information or resources;
  • a nonconformity has been identified, for example during monitoring and measurement, an internal audit, a penetration test or a certification audit.
  1. 01

    Report

    The incident is reported to the incident manager and recorded in the incident register.

  2. 02

    Classify

    The incident is classified by severity. For information security incidents, the security officer is involved.

  3. 03

    Analyse and recover

    Cause and impact are investigated, measures are taken and those affected are informed.

  4. 04

    Close and learn

    The incident is documented and closed; improvement actions are recorded and followed up.

Risk assessment

Identifying and assessing information security risks.

The risk assessment procedure consists of four steps to identify, evaluate and control information security risks.

  1. 01

    Set criteria

    Criteria for likelihood and impact (high, medium, low) and acceptance criteria are set and adjusted where necessary.

  2. 02

    Identify risks

    Threats to the confidentiality, integrity and availability of assets and processes are mapped.

  3. 03

    Analyse risks

    Likelihood and impact are estimated for each risk; the combination determines the risk level.

  4. 04

    Evaluate risks

    The risk level is tested against the acceptance criteria and the treatment is decided.

Risk treatment

Treating and mitigating identified risks.

Risk assessments take place at least annually, and after any significant change or incident. The risk manager organises the assessment with the owners of the relevant business processes within the ISMS scope.

Initial assessment

The values for likelihood and impact are evaluated and adjusted where needed. Generic risks are then translated to the organisation's processes and assets, with an estimate of likelihood and impact. New risks are added. Each risk has an owner, usually the responsible manager or process owner.

Annual reassessment

Likelihood and impact of all risks are reassessed and the effectiveness of measures is determined. Where measures are not effective, the risk owner decides how to handle the residual risk: accept, reduce, avoid or transfer (insure). New risks can be added based on recent incidents or events.

Example: one risk over time

MomentLikelihoodImpactRiskTreatment
InitialHMHReduce: two Annex A controls are implemented; expected residual risk L
First evaluationMLLAccept: the measures are effective
Second evaluationHLMReduce: existing measures are extended and an additional measure is taken

Acceptance criteria

  • All identified risks are mitigated to level L.
  • Risks at level M are mitigated within 12 months.

Change management process

Managing and approving changes to systems and infrastructure.

The change management process applies to operational changes (such as process changes), changes to internal and external IT components and any other change likely to affect the confidentiality, integrity or availability of information within the ISMS scope.

  1. 01

    Submit

    The change is submitted to the change manager and recorded in the change log.

  2. 02

    Impact analysis

    The impact on all stakeholders is analysed. If the data processing involves a high risk, a DPIA is carried out.

  3. 03

    Treat risks

    Information security risks are identified and treated. Risks classified M or H require management approval.

  4. 04

    Plan and execute

    The change is scheduled and carried out.

Software development process

Secure development, including code reviews and security testing.

  1. 01

    Specification

    User stories are created and prioritised in the ticketing system. Stories affecting the availability, integrity or confidentiality of data are discussed with senior developers to choose a secure approach.

  2. 02

    Development

    Developers build and test locally on their workstation first.

  3. 03

    Pull/merge request

    A completed story is submitted via a pull/merge request for merging into the main branch.

  4. 04

    Code review

    The code is reviewed by another team member.

  5. 05

    Deploy to staging

    A pipeline deploys the software automatically to the staging environment.

  6. 06

    Test on staging

    Libraries are checked for vulnerabilities and a static code review is performed.

  7. 07

    Deploy to production

    A pipeline deploys the software automatically to production.

  8. 08

    Test on production

    Manual tests confirm the production system works correctly.

Authorisation management process

Managing user rights and access authorisations.

Available after login

This section contains internal and technical details. Customers and prospects can read it after logging in.

Customer onboarding process

Security arrangements when onboarding new customers.

  1. 01

    Establish compliance requirements

    Together with the customer, we establish whether specific compliance requirements apply, such as two-factor authentication, labelling of sensitive information or customer-specific policies.

  2. 02

    Record arrangements

    Special arrangements, such as deviations from the standard SLA, are recorded in the overview of legal and contractual requirements.

Questions or a security report?